In 2025, at the Shrine of Divine Mercy in Płock, thanks to the generosity and great kindness of our donors, we were able to carry out many works. From April to December 2025, design works related to the interior arrangement of our church were carried out; we purchased new organs together with speakers; an illuminated display case was made in the vestibule of the Shrine; equipment for online transmission was installed and internet access was connected in the new building; works related to systems ensuring the safety of people staying on our premises were completed (fire protection system, monitoring, access control, etc.); plantings were made in the courtyard of the Shrine, and a waste shelter was built. We equipped the conference room with tables, necessary furniture, and sound system; tables were purchased for the café; we furnished rooms with kitchenettes in the new part of the Pilgrims’ House; we made available to pilgrims restrooms equipped with dispensers for towels, soap, paper, etc.
The most important works planned for 2026 are the installation of the floor and the construction of new, comfortable pews for the Shrine. If funds allow, we also plan to install the final sound system and complete other elements of the interior décor. At the same time, we wish to further equip the café with necessary appliances: an oven, dishes, and a coffee machine, so that it may fully serve pilgrims from all over Poland and from around the world who come to our Shrine.
The completion of the above works would not have been possible without the support of donors. We believe that God Himself desires this place to radiate His Mercy and that everyone may draw here from the Source, experiencing an encounter with Him. We feel honored to be able to build such an important place, where for the first time the Merciful Jesus appeared to Saint Sister Faustina, and that we can do this together with you. We invite you to the Shrine of Divine Mercy in Płock!












